PR Constructions

Messologhiou 3

It is the structural reconstruction – restoration of a beautiful house of 1969.
This restoration took place in 2019 and lasted five months.
1Apartments
Apartment 75 sq.m

Construction

  • High quality materials were used, such as acrylic kitchen doors with solid oak counter (trunk).
  • Italian tiles in all areas and pressed cement mortars with marble skirting boards.
  • LG central air conditioning.
  • Gas heating unit, connected to a solar water heater.
Preview